A detailed 3D model was created to show the 500-million dollar construction project of a 10-mile section of I-95 at the Virginia / Maryland Border, it includes four multi-level interchanges and a major bridge (Woodrow Wilson Bridge) across the Potomac River. Using AutoCAD Land evelopment and 3D Studio Max 3.1, a multi gigabyte 3D database was created to engineering accuracy. The animation is 19,000 frames long and had to managed so that every time a change was made the project can be re-rendered, composited and posted in a 48 hour turn around, using five-dual 933 PCs.
Credits
Michael Bogatin AnimatorCurt Coleman ModelerJim Winborg ModelerChi Tran ModelerCharles Parsons Video EditorAl Torres Jr. PhotoshopNorine Walker Project Supervisor
Contact Information
michael_bogatin@urscorp.com<BR>www.urstampa.com<BR>7650 W Courtney Campbell Causeway<BR><BR>Tampa, FL 33607<BR>United States<BR>813-286-1711<BR>Fax: 813-287-8591